Services

We get the job done right the first time, every time, never sacrificing efficiency or quality. “The way we’ve always done it” isn’t a phrase we use around here. Our core values guide us to intentionally adapt to how it CAN be done, to realize our clients goals with efficiency and discipline. And with an unlimited-unclassified general contractor license, there’s no project we can’t handle.

Site Infrastructure

Sanitary Sewer

Storm Drainage

Water Distribution

Environmental

Services

We get the job done right the first time, every time, never sacrificing efficiency or quality. “The way we’ve always done it” isn’t a phrase we use around here. Our core values guide us to intentionally adapt to how it CAN be done, to realize our clients goals with efficiency and discipline. And with an unlimited-unclassified general contractor license, there’s no project we can’t handle.

Site Infrastructure | Sanitary Sewer | Storm Drainage | Water Distribution | Environmental | Transportation| Forestry Mulching and Clearing

We’re Not Like the Other Guys

9

Our Team is our "Secret Sauce"

Happy workers are hard workers. We invest in our team, which results in them investing in their work. Our crews are some of the hardest working people around and are passionate about disciplined execution for the good of our clients.

9

We Communicate

When you work with us, you can expect consistent and clear communication, so you’re never left wondering about the status of your project.

9

We are Strategic Innovators

Cutting edge technology means we’re not only keeping up with industry standards; we’re pushing the envelope and driving it forward. We use state of the art GPS and robotic total stations, as well as automated machine control for efficiency and accuracy.

Learn more about the people that set us apart

Site Infrastructure

Our Site Infrastructure services include Earthwork, Clearing, Utilities, Curb, Stone, Asphalt and anything else an owner may need to prepare their site for vertical construction.

We pride ourselves in giving a through and detailed cost analysis of the site to limit risk of change orders and unknowns. Our team of passionate professionals are built for velocity. We challenge ourselves each day to deliver aggressive schedules for our clients and be the best in class of quality and speed, never switching the order of importance. 

Academy Pointe

Multi-phase residential development in downtown Clayton, NC.

Site work included  retaining walls, storm filter, highlighting dirt import, aerial showing the urban location, aggressive schedule.

Thanksgiving Elementary

We were contracted by WIMCO to do this third party school grading and utility contract.

Services included site grading, utilities, curb, stone, and asphalt.

Tractor Supply

Turnkey site development for a new Tractor Supply Company in Clayton, NC.

We implemented a plan for road widening that had been delayed, and were able to meet the project deadline on a tight schedule.

TOC Access Rd and WRF Early Grading

Turnkey site development for the Town of Clayton access road and WRF early grading.

We provided erosion control, earthwork, water and storm utilities, and ABC access road to the project.

Sanitary Sewer Installation and Rehabilitation

Our crews love sewer projects. The more complex, conflict riddle, urban based, and rehab oriented it is, the better! Our crews have over 60 years of experience from waste water treatment plants, to sewer installs on large runs, to municipality rehab projects. We deliver what our clients needs on time and with our family of builders’ safety as priority.

Thanksgiving Force Main & Pump Station

This project included PS- 190 GPM and 6,500lf of 6″ PVC sewer force main piping to include boring under US-Hwy 42. We also installed 1,200 LF of directional drilling.

The four sections of this project included two under creeks, one under a swamp area, and one under a subdivision entrance.

Little Creek Outfall

The Project consists of Sanitary Sewer System Improvements, including 8, 10, and 12-inch PVC gravity sewer main, 30-inch PVC gravity sewer main, 24 and 30-inch DI gravity sewer main, steel casing by bore & jack, steel casing by open cut, abandonment of 1,700 ft of existing 18-inch sewer, and By-pass Pumping.

Regional Commerce Center

wp_ was called in to hit critical milestone dates for the Prime Contractor and General Contractor. The site, in Durham, NC has 410,000 square foot warehouse space with infrastructure to accommodate their utility needs and parking needs. Our scope was 10,000 LF of storm drain, 3,000 LF of sewer, and 8,000 LF of waterline in a 12 month schedule.

Storm Drainage

As our local areas continue to expand and become more dense in population growth, so the need for storm drainage increases. wp_ can handle a wide variety of storm drainage needs from box culverts and complex storm filter systems, to long runs of traditional RCP in new neighborhoods. We want to earn you trust a the preferred storm drainage installer in Central NC.

Regional Commerce Center

wp_ was called in to hit critical milestone dates for the Prime Contractor and General Contractor. The site, in Durham, NC has 410,000 square foot warehouse space with infrastructure to accommodate their utility needs and parking needs. Our scope was 10,000 LF of storm drain, 3,000 LF of sewer, and 8,000 LF of waterline in a 12 month schedule.

Holly Springs Project

We upgraded the existing drainage systems in three neighborhoods in order to prevent flooding of private property.

Services included storm drainage, erosion control, clearing, paving, concrete, and landscape repairs, as well as a 72″ Corrugated Aluminum Culvert with stream bypass.

Ashcroft and Academy Point Storm Filter

We installed an underground stormwater treatment device comprised of multiple structures that house rechargeable, media-filled cartridges. Those cartridges trap particulates and absorb pollutants from stormwater runoff such as total suspended solids, hydro carbons, nutrients, metal, and other common pollutants.

Water Distribution

Our communities need water, and Providence Construction steps up to deliver. Whether is it running water down the side of a state road or replacing in an urban street, our team of passionate professionals is ready for the challenge.

Village at Parkview

We installed 100+ 3/4 water services and backfill and tamped in just a little over a month time frame. These were ran with 3/4 copper per town standards and were inspected daily with the Town of Clayton.

Covered Bridge

This site had 57 3/4 water service that we installed and backfilled within a three week time frame, desptie weather challenges. Our scope. ofwork included running 3/4 poly line throughout the neighborhood.

Walton Farm Water Installation

We ran the water lines for a 310-unit apartment community in Clayton, NC. 

Environmental

Protecting our environment is essential. Our team of environmental specialists range from home builder erosion control, stream restoration, wetland preservation, dam repairs, and large scale sedimentation clean up. We stay ready to help our clients when they need it most.

Buffalo Creek Restoration

Providence Construction completed 5,029 linear feet of Stream Restoration and Enhancement.

We also completed 3.4 acres of Wetland Enhancement and Re-establishment.

Cleveland Bluffs

Project consist of repairing a breach at the existing pond dam, buffer/stream repairs and restoration, grading and reshaping the existing pond, removing and replacing unsuitable material at the new dam, forebay installation, new pond outlet structure and storm drainage, and matting/seeding for a turnkey installation.

Tractor Supply Pond Conversion

Providence converted a wet pond into a bio pond at the wettest part of the year
We worked from sun up to sun down 7 days a week for the owner to get the job done on time
As built the pond as it was being built to insure there were no concerns about the finished product and pond was being built perfectly to detail